1. The structural engineering and structural joints of the condole cabinet and condole cabinet have the conditions of installing condole cabinet and condole cabinet, and set the indoor horizontal line.
2. After the condole ark frame and fan enter the site, the processed products should be pasted on the wall and floor in time. The top surface should be painted with anticorrosive paint. Other surfaces shall be coated with base oil and then classified, and the bottom shall be level and maintained. Ventilation, generally should not be stored in the open air.
3. Before installation, check the condole cabinet and condole cabinet frame and fan for defects, warp yarn, bending and wall cracks. If any of these defects are found, they shall be repaired and assembled. The steel frame specification of the condole ark should be checked and its deformation should be modified before installation.
4. The frame installation of condole ark and condole ark should be carried out before plastering; Install the fan after painting.
Customer Service Hotline:
400-0543-011
mailbox:zhanlang@cnwolfwarriors.cn
Mobile phone:15054316222
Landline:0543-2800017
address:Industrial Park, Xingfu Town, Boxing County, Shandong Province
Copyright © 2019 wolf All Rights Reserved.